Construction Date: 2016
Project Location: Istanbul/Turkey
Architect: Piramit Mimarlık
Concractor: Tek Yapı İnşaat ve Ticaret
Aplication Area: 10.000 m2
Scope of Work
In the R&D center of Kordsa Center, which has made a difference with its mission of “Strengthening Life” Aluminium Stick Curtain Wall,Aluminium Composite Sheet Claaaings,Glazed Railing System,Aluminium Mesh Claddings,Sun Shading,Sun Shading System were preferred


Construction Date: 2016
Project Location: İstanbul/Turkey
Architect: Emre Arolat Mimarlık
Concractor: Torunlar GYO A.Ş.
Aplication Area: 50.000 m2
Scope of Work
Alüminium Stick System Curtain Wall,Aluminium Panel Unitized Panel System Curtain Wall were preferred in the Torun Center project, which is designed for mixed use, equipped with features that can meet all the demands of modern life.
Construction Date: 2016
Project Location: England/London
Architect: 5plusarchitects
Contractor: SGP Contracts LTD
Application Area: 3.000 m2
Scope of Work
In the Royal London House project, which met with the technology of the twenty-first century and revealed a new perspective of the city, Aluminium Stick System Curtain Wall,Aluminium Composite Sheet Claddings were preferred.











Construction Date: 2016 - 2018
Project Location: Istanbul/Turkey
Architect: Efekta Architects
Concractor: SVR Gayrimenkul Yatırım San. Ve Tic. A.Ş
Aplication Area: 32.320 m2
Scope of Work
MN 50 Alüminium Unitized Panel System Curtain Wall,Alüminium Composite Sheet Claddings were preferred in the Business Istanbul project, which offers a unique alternative to the business world with its innovative architecture and comfortable office life.






Construction Date: 2018
Project Location: İstanbul/Turkey
Architect: Yazgan Tasarım Mimarlık
Contractor: Rönesans Teknik İnşaat San. ve Tic. A.Ş.
Application Area: 46.000 m2
Scope of Work
Aluminium Unitized Panel System Curtain Wall,Alüminium Stick System Curtain Wall,Aluminium Composite Sheet Claddings,Glazed Railing System,Sun Shading System were preferred in the Maltepe Piazza project, which differs from its peers with its design with an environmentalist perspective.
Construction Date: 2018
Project Location: İstanbul/Turkey
Architect: Arima Architects
Concractor: GYA Gayrimenkul Yatırım ve İnş. A.Ş
Aplication Area: 61.600 m2
Scope of Work
In the Turkuvaz Media Center project, which serves as printing, TV and Plaza blocks, with a size of approximately 300,000 m², Aluminium Stick Curtain Wall,Composite Claddings,Transparent Facades,Aluminium Expanded Plate Claddings and Catwalk System were preferred.


Construction Date: 2018
Project Location: İstanbul/Turkey
Architect: Tago Mimarlık
Concractor: Ülke Proje Yönetim Danışmanlık ve İnşaat A.Ş
Aplication Area: 42.000 m2
Scope of Work
Sinpaş Gyo Queen Central Park project preferred Aluminium Unitized Panel System Curtain Wall Aluminium Stick System Curtain Wall,Aluminium Joineries,Glazed Railling System,Perfored Cladding Seperations and Office Partition Systems.






Yapım Yılı: 2014 - 2017
Proje Yeri: İstanbul/Türkiye
Mimar: Ağaoğlu Mimarlık
Müşteri: Akdeniz İnşaat ve Eğitim Hizmetleri A.Ş
Uygulama Alanı: 115.000 m2
İşin Kapsamı:
In the Ağaoğlu Maslak 1453 project Aluminium Unitized Panel System Curtain Wall,Aluminium Perforated Railings were preferred.
Construction Date: 2014
Project Location: England/London
Architect: 5plusarchitects
Concractor: SGP Contracts LTD
Aplication Area: 9.700 m2
Scope of Work
In Montcalm Shoreditch City Road Hotel project, Aluminum Unitized Panel System Curtain Wall, Glass Entrance Facade, Shading.







Construction Date: 2014
Project Location: Azerbaycan / Bakü
Architect: Heerim Architects & Planners
Contractor: TEKFEN İNŞAAT VE TESİSAT A.Ş.
Application Area: 12.600 m2
Scope of Work
Alumimium Stick System Curtain Wall,Aluminium Composite Sheet,Claddings,Shaading,Canopy were preferred in the project, which is of high importance for the projects and applications to fully meet the national and international standards in the design phase of the stadium constructions.







Construction Date: 2020
Project Location: İstanbul/Türkiye
Architect: Melek Düvenci Architects
Contractor: Polisan
Authorrized Practitioner: Aluneta
Scope of work
In Bebek Penthouse project, the SL 45 system, which maximizes the visual contact with the external environment and has a stylish appearance with its new generation Bodrum lift-and-slide arm design, was preferred. In addition, this system was applied as floor and wall recessed.










Yapım Yılı:
Proje Yeri: İstanbul
Mimar:
Müşteri:
Uygulama Alanı:
İşin Kapsamı:
42.590 izleyici kapasiteli çok amaçlı stadyumun idari binasında interwall Vitrum Duo Ofis içi Bölmelendirme Sistemi tercih edildi.
Construction Date: Ongoing Project
Project Location: İstanbul/Türkiye
Contractor: Limak İnşaat Sanayi ve Ticaret A.Ş.
Authorized Applier: Çuhadaroğlu Alüminyum Sanayi A.Ş.
Scope of Project:
IUFM' de Çuhadaroğlu İmzası!
Çuhadaroğlu made a mark on IUFM!
The contract negotiations concerning "Istanbul International Financial Center TCMB Phase 1 (Shell and Core) Construction Project" between Çuhadaroğlu Alüminyum Sanayi ve Ticaret A.Ş. and Limak İnşaat Sanayi ve Ticaret A.Ş. were concluded on 13.01.2021 and; Çuhadaroğlu was preffered with custom design panel system for the 69.690 m2 façade of this project, which would take Turkey' s tallest building title with a height of 320 meters.


Construction Date: 2017 - 2018
Project Location: Tahran/Persian
Contractor: NAMAKARAN
Application Area: 14.500 m2
Scope of Work
Aluminium Unitized Panel System Curtain Wall
Construction Date: 2013
Project Location: Brüksel/Belçika
Architect: Atelier d'Architecture Anthony Bechu - Tom Sheehan
Contractor: Belgo Metal
Application Area: 54.000 m2
Scope of Work
The Tour D2 Tower, which is 171 meters high in the business district of La Défense and used for office purposes in the municipality of Courbevoie, also has a garden open to visitors on its roof. Aluminum panel manufacturing workmanship, specially designed for the Tour D2 Tower building, was preferred here.


DOUBLE TREE BY HILTON
Construction Date: 2010
Project Location: İstanbul/Turkey
Architect: Uras Dilekçi Mimarlık
Contractor: Sonkar Otomotiv
Aplication Area: 11.884 m2
Scope of Work:
Alüminium Stick System Curtain Wall,Alümium Composite Sheet Claddings
DoubleTree by Hilton back Turkey's first steel and capable of being the tallest hotel building is a hotel project in the 110 meters in height. Çuhadaroğlu special design panel systems were preferred in the project.
Construction Date: 2013
Project Location: İstanbul/Turkey
Architect: Tabanlıoğlu Mimarlık
Contractor: Koray İnşaat
Application Area: 45.000 m2
Scope of Work
Levent 199 project is in Levent, the epicenter of the Turkish business world. The project was awarded the 2010 Europe and Africa Property Awards 2012 and Turkey's Most Successful Real Estate Investments. In this project, Aluminium Unitized Panel System Curtain Wall,Aluminium Stick System Curtain Wall,Aluminium Joineries,Lovre,Folded Terrace System were preferred.








Yapım Yılı: 2016 - 2017
Proje Yeri: İstanbul/Türkiye
Mimar: Ağaoğlu Mimarlık
Müşteri: Akdeniz İnşaat ve Eğitim Hizmetleri A.Ş
Uygulama Alanı: 25.000 m2
İşin Kapsamı:
Alüminyum Panel Giydirme Cephe,
Alümnyum Perfore Levha Korkuluklar





Construction Date: 1998
Project Location: Istanbul/Turkey
Arcitect: Swanke Hayden - Doğan Tekeli - Sami Sisa
Concractor: Tepe Turner Steiner İnş. Ort.
Application Area: 63.145 m2
Scope of Work:
Equivalent to approximately three times the height of the Bosphorus Bridge, İşbank Headquarters Complex was statically constructed in a manner to withstand even the most severe earthquakes in the first degree earthquake zone, by staying in the elastic zone. In this project, Aluminum Panel Curtain Wall, Aluminum Stick System Curtain Wall, Aluminum Joineries, Skylight, Glass Showcase, Aluminum Sheet Claddings were preferred for the complex





Construction Date: 1998
Project Location: İstanbul/Turkey
Architect: Haluk Tümay
Concractor: Koray Yapı End. Ve Tic. A.Ş.
Application area: 5.500 m2
Scope of Work
Aluminium Composite Sheet Claddings,Aluminium Unitized Panel System Curtain Wall were preferred for the project located inside the Yapı Kredi Plaza campus in Levent, Istanbul.


Construction Date: 2004
Project Location: İstanbul/Türkiye
Architect: Tanju Edige
Contractor: Sun Jut A.Ş.
Application Area: 17.812 m2
Scope of Work
Aluminium Stick Curtain Wall ,Aluminium Joineries were preferred in the Sun Plaza project, which allows very comfortable settlement in all kinds of spaces with its square form architectural plan design that does not create any lost areas.



Construction Date: 2008
Project Location: Almatı/Kazakhistan
Architect: SOM
Contractor: Enka İnşaat ve Sanayi A.Ş.
Application Area: 33.208 m2
Scope of Work
Esentai Park Complex, which is the only example of its kind in Central Asia, is located in an area where seismic activities are very intense, so it was equipped with smart building systems and designed to withstand 8,5 earthquakes according to the Richter Scale. In this project,Aluminium Stick System Curtain Wall,Aluminium Composite Sheet Claddings,Aluminium Joineries were preferred.


Construction Date: 2016
Project Location: İstanbul/Turkey
Architect: Dome+Partners
Contractor: Sera Yapı Endüstrisi ve Tic. A.Ş
Application Area: 44.500 m2
Scope of Work
Aluminium Joineries,Aluminium Composite Sheet Claddings ,Glazed Railing System and Seperations were preferred in the İnistanbul Project, which is easily accessible from all over the city and was awarded in the "Best Architectural Design" category within the scope of the Sign of The City Awards.


Construction Date: 2015
Project Locatiob: Paris/Fransa
Architect: Jean-Paul VIGUIER
Contractor: SICRA IDF
Application Area: 6.000 m2
Scope of work
In Zac Clichy Batignolles project,Aluminium Composite Sheet Claddings,Aluminium Unitized Panel System Curtain Wall were preferred for the design.


Construction Date: 2012
Project Location: Necef/Irak
Architect: AE Mimarlık Atölyesi
Contractor: Rotam Grup
Application Area: 7.900 m2
Scope of Work
Aluminium Stick Curtain Wall
Skyligt



Yapım Yılı: 2017
Proje Yeri: İstanbul/Türkiye
Mimar: Ağaoğlu Mimarlık
Müşteri: Akdeniz İnşaat ve Eğitim Hizmetleri A.Ş
Uygulama Alanı: 4.000 m2
İşin Kapsamı:
Alüminyum Çubuk Sistem Giydirme Cephe,
Alüminyum Levha Kaplamalar,
Cam Korkuluk Sistemi,
Aluminyum Mesh Cephe Kaplama





Construction Date: 2016
Project Location: İstanbul/Türkiye
Architect: Dome+Partners
Contractor: Sera Yapı Endüstrisi ve Tic. A.Ş
Application Area: 60.000 m2
Scope of Work
Aluminium Joineries,Aluminium Composite Sheet Claddings ,Glazed Railing System and Seperations were preferred in the İnistanbul Project, which is easily accessible from all over the city and was awarded in the "Best Architectural Design" category within the scope of the Sign of The City Awards.



Construction Date: 2014
Project Location: Paris/Fransa
Architect: Architecture Anne Demians
Contractor: Laine Delau
Application Area: 5.000 m2
Scope of Work
In this project, which offers visual opportunities in a vertical view, large perforated steel strips change the surface of the facade. Aluminum Aluminium Sheet Claddings are preferred here.
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
Construction Date: 2020
Project Location: Kayseri/Türkiye
Achitect: Serdar Sabri Pasayigit Architecs
Contractor: İnoto GY - Yılmaz Cephe
Application Area: 7 Villa Joineries
Scope of Work
In Kayseri, with the cooperation of Sabri Pasayigit Architecs and our authorized practitioner Yılmaz Cephe, the construction of Neva Tepe Villas was started as interal systems with S50 sliding, ST70 CV concealed wing and MN50 facade systems together with the new generation Bodrum arm family.